C & Z Purlins
Cold-formed lipped sections spanning between trusses, lapped for continuity at supports.
Cold-formed C and Z purlins, roof trusses and connection sets engineered for the span, pitch and wind zone of your building — and coordinated with the tile fixing grid above.
Cold-formed sections arrive cut to length, punched and labelled. Because the purlin spacing is set against the tile cover width, the framing, underlay and roof surface all share one fixing grid — which removes the most common source of installation delay.
Cold-formed lipped sections spanning between trusses, lapped for continuity at supports.
Site-bolted truss assemblies designed for the project span, pitch and load case.
CONNECTIONSBase plates, cleats, bracing straps and bolt packs matched to the structural schedule.
Typical values for the standard range. Structural calculations and section schedules are issued per project.
| Parameter | Typical value / option |
|---|---|
| Material | Cold-formed galvanised steel strip |
| Common grades | G550 / S350GD with Z275 galvanised coating (project dependent) |
| Section types | Lipped C and Z purlins, truss chords and webs, bracing straps |
| Thickness range | 1.2 mm – 3.0 mm, selected by span and load case |
| Typical truss span | 6 m – 12 m (longer spans engineered to order) |
| Connections | Bolted cleats and base plates; no site welding |
| Coordination | Purlin spacing set to the selected roof tile cover width |
| Documentation | Section schedule, cutting list, setting-out drawing and bolt list |
* Indicative values for illustration. Confirm the current certified data sheet, test reports and project-specific requirements with the QB Roof engineering team before specification or order.
Span, pitch, wind and load data, plus the architect’s roof geometry.
Purlin and truss sizing, bracing layout and connection schedule.
Cut to length, punched, galvanised, labelled by roof zone.
Setting-out drawings, bolt lists and on-site installation guidance.
Send them over with the roof pitch and span. We will return a framing schedule coordinated with the tile and drainage take-off.